EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
MartysRV14A
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (453)
Research
Workshop
- (4)
Empennage
- (54)
Wings
- (84)
Fuselage
- (47)
Avionics
- (31)
Engine
- (40)
-
First Engine Start
-
Day Before First...
-
Engine Pre-Oil;...
-
First Electrical...
-
Engine Systems:...
-
Engine Systems:...
-
Engine Systems: Sensors
-
Engine Systems: Sensors
-
Engine Systems: Air...
-
Engine Systems: Air...
-
Engine Systems: Air...
-
Engine Systems:...
-
Engine Systems: P-Mags
-
Engine Systems: Exhaust
-
Engine Systems:...
-
Engine Systems:...
-
Engine Systems:...
-
Engine Systems:...
-
Engine System: Air...
-
Engine Systems:...
-
Engine Systems: Oil...
-
Engine Systems: Heat...
-
Engine Systems: Fuel...
-
Engine Systems: Fuel...
-
Engine Systems: Exhaust
-
Engine Systems: Exhaust
-
Engine Systems
-
Engine Install
-
Engine Prep - Oil Fill
-
Engine Prep -...
-
Various Engine Items
-
Engine Prep
-
Installing Rear...
-
Engine Delivery Update
-
Lycoming Engine...
-
Lycoming Engine...
-
Engine: Lycoming...
-
Engine: Lycoming...
-
Engine: Lycoming...
-
Engine: Lycoming...
Propeller
Firewall Forward
- (41)
Controls
Lighting
- (2)
Instrument Panel
- (3)
Fuel System
- (1)
Finish
- (63)
Painting
- (2)
Inspection
- (3)
Insurance
- (1)
Air Cond
- (35)
Cowling Mod
Interior
- (1)
Transport
- (4)
Training
- (2)
Final Assemb
- (4)
Pre-Flight
- (4)
Flight
- (19)
Maintenance
- (7)
Performance
- (1)
Builder Name:
Martin Guinn
-
Project:
Vans - RV-14A
-
VIEW REPORTS
Total Hours:
1990.5
Total Flight Time:
36.1
Total Expense:
N/A
Start/Last Date:
Aug 30, 2019 - Dec 06, 2021
Engine:
Lycoming YIO-390-A3B6 Thunderbolt
Propeller:
Hartzell
Panel:
G3X Touch/GTN 650xi, SteinAir
Friendly URL:
https://eaabuilderslog.org?s=MartysRV14A
Home or Last Project Picture
Apr 23, 2021
Engine Systems: Sensors
- (4 hours)
Category: Engine
Completed connecting EGT and CHT sensors to leads using overlap connectors. Covered connectors and wiring with shrink wrap and used safety wire to secure mesh sleeves. Confirmed continuity of each sensor.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.